Skip to main content
19 August 2021 | dataset

Environmental Impact Assessment Report: The proposed construction and operation of a subsea fuel pipeline and offshore mooring system for the discharge of petroleum products at Rarotonga, Cook Islands

This document is aligned with the Terms of Reference (TOR) issued by National
Environment Services (NES) for guidance and advice in the preparation of
Environmental Impact Assessment (EIA) for the Installation of Tanker Moorings and
Construction of a Sub-sea Pipeline.
The TOR identifies all issues that need to be addressed by the EIA.
Both facilities are for the purpose of conveying petroleum fuels into onshore storage
facilities.
Tanker mooring facilities are located offshore at Areanu Tapere, Avarua District.
Sub-sea pipeline facilities commences from the offshore moorings and continue
towards shore, terminating at Pacific Island Energy (PIE) storage facilities.

Online only

Call Number: [EL]

Physical Description: 56p. : ill. (col.) ; 29cm.

Data and Resource

Field Value
Publisher SPREP Pacific Environment Information Network (PEIN)
Modified 27 August 2021
Release Date 19 August 2021
Source URL https://library.sprep.org/content/environmental-impact-assessment-report-propos…
Identifier VL-41244
Spatial / Geographical Coverage Location SPREP LIBRARY
Relevant Countries
License Public
[Open Data]
Contact Name SPREP Records and Archives Officer
Contact Email [email protected]