Primary tabs
Papua New Guinea: Lae Port Development Project
The Lae Port Development Project – Tidal Basin Phase 1 comprises one basin 400m × 700m, one berth of length of 240m for one 50,000 tonne DWT container vessels, a 120,000m2 container terminal yard, a link road, terminal buildings, utilities, and support facilities. The tidal basin was originally dry land and has been constructed by clearing existing vegetation, dredging originally to a depth of -13 metres below MSL, although at the request of TOTAL Oil Company this has now been changed to -14 metres, constructing a wharf for berthing of ships and reclaiming the cleared land by lifting the height of the platform to form a container storage yard.
Additonal Information
Field | Value |
---|---|
mimetype | application/pdf |
filesize | 3.67 MB |
timestamp | Mon, 05/13/2024 - 13:00 |
Source URL | https://png-data.sprep.org/dataset/port |