Preliminary Environmental and Social Management Plan

In partial fulfillment with ESS1, the GoTv and World Bank have agreed that a "Preliminary Project-Wide Environmental and Social Management Plan (Preliminary ESMP)" shall be prepared and be made available by Project Appraisal, pending the development of the detailed Project Design, thus this Preliminary ESMP. This Preliminary ESMP includes subsidiary ES management instruments designed to address specific issues and requirements of the WB ES Standards. These include Stakeholder Engagement Plan (SEP), Labor Management Procedures (LMP), Code of Social and Environmental Practice for Contractors (COSEP-C), Infection Prevention and Control Plan (IPCP), Waste Management Guidelines (WMG) and UXO Protocol.

Additonal Information

Field Value
mimetype application/pdf
filesize 9.93 MB
timestamp Mon, 09/26/2022 - 13:00
Source URL https://tuvalu-data.sprep.org/dataset/tuvalu-health-system-strengthening-project-thssp