GHD was commissioned by UNDP to undertake a wind resources assessment for Upulo, Samoa. Based on the Afulilo on-site data and the NCAR reference data, the long-term average wind speed (LTAWS) for the 30 m level at the Afulilo site was estimated as 4.01 m/s.
The Government of Samoa, the power utility Electric Power Corporation (EPC), the Secretariat of thePacific Islands Applied Geoscience Commission (SOPAC) and the United Nations DevelopmentProgram (UNDP) are undertaking a wind resource assessment project for Upolu Island, Samoa. The project has installed, and operated two wind monitoring stations on Upolu: one in Aleipata on thesoutheast coast and one on higher ground at the Afulilo dam.
- Afulilo site: 17 November 2006 to 20 November 2008
- Aleipata site: 15 June 2007 to 20 November 2008.
keywords: Samoa, wind resource monitoring, Upolu, renewable energy
Data and Resource
Field | Value |
---|---|
Publisher | Pacific Data Hub |
Modified | 24 June 2022 |
Release Date | 06 April 2020 |
Source URL | https://pacificdata.org/data/dataset/f0f7000e-1da5-4a92-824b-1d775e43b8f9 |
Identifier | f0f7000e-1da5-4a92-824b-1d775e43b8f9 |
Spatial / Geographical Coverage Location | Array |
Relevant Countries | Samoa |
License |
Public
|